Maintenance; General; Maintenance Message; Standard Inspection And Maintenance Operations - REMEHA Quinta Ace 30 Installation And User Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

9

Maintenance

9.1

General

9.2

Maintenance message

9.3

Standard inspection and maintenance operations

7684359 - v.06 - 10012019
The boiler does not require a lot of maintenance. Nevertheless, the boiler
must be inspected and maintained periodically. To determine the best time
for servicing, the boiler is equipped with an automatic service message.
The control unit determines when this service message appears.
Caution
Maintenance operations must be completed by a qualified
installer.
During inspection or maintenance work, always replace all
gaskets of the disassembled parts.
We recommend taking out a maintenance contract.
Replace defective or worn parts with original spare parts.
An annual inspection is mandatory.
The boiler display will clearly indicate that a service is required at the
appropriate time. Use the automatic maintenance message for preventive
maintenance, to keep faults to a minimum. The service messages show
which service kit must be used. These service kits contain all parts and
gaskets that are required for the relevant service. These service kits (A, B
or C) put together by Remeha are available from spare parts suppliers.
Important
Maintenance messages must be followed up within 2 months.
Important
If the iSense or eTwist modulating thermostat is connected to the
boiler, this thermostat can also display the maintenance message.
Consult the thermostat manual.
Caution
Reset the maintenance message following every service.
For more information, see
Additional documentation, page 10
9.3.1

Checking the water pressure

1. Check the water pressure.
Important
The recommended water pressure is between 1.5 bar and 2 bar.
The water pressure must be at least 0.8 bar.
2. If necessary, top up the central heating system.
9.3.2

Checking the ionisation current

1. Check the ionisation current at full load and at low load.
The value is stable after 1 minute.
2. Clean or replace the ionisation/ignition electrode if the value is lower
than 4 µA.
9 Maintenance
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents