Connecting Diagrams; How To Use The Installation Examples - REMEHA Gas 320 Ace Service Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 320 Ace:
Table of Contents

Advertisement

5.2

Connecting diagrams

5.2.1

How to use the installation examples

Fig.29
Zone
Fig.30
Heat demand
Fig.31
Hydraulic connections
Fig.32
Electrical connections to be made
Fig.33
Electrical connections to be bridged
7734325 - v.07 - 22092022
In this chapter, a few installation examples are given. Each example
provides a quick overview of a simple hydraulic set-up, together with the
connections that have to be made and the parameters to be set on the
PCB's.
Important
To use these examples, basic installation knowledge is needed.
This explanation shows schemes for the SCB-10 with an AD249
fitted. On a SCB-02, not all zones are available.
The installation example tables are laid out as follows:
The schemes are divided in columns. All relevant connections and settings
are grouped per column.
AD-3001510-01
Heat demand: The top row shows the heat demand (if applicable) for the
zone.
AD-3001506-01
Hydraulic connections: Only the essential parts are shown, parts to be
connected to a PCB are numbered.
AD-3001507-01
Electrical connections: The numbers in the hydraulic connections refer to
the connectors on this row. There are multiple digits to identify the type of
connection:
A
Heat demand device.
1,2,... The numbers in the hydraulic connections refer to the connectors
on this row. Connect component no. 1 from the hydraulic scheme
to the connector shown on line 1.
AD-3001508-02
Electrical connections to be bridged: These connectors must be bridged.
Some bridges are already factory-fitted, some need to be fitted for the
specific installation example.
AD-3001997-01
5 Installation examples
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 620 ace

Table of Contents