Connecting The System Pump; The Cb-01 Connection Pcb - REMEHA Gas 210 Ace 80 Installation And User Manual

High-efficiency standing gas boiler
Hide thumbs Also See for Gas 210 Ace 80:
Table of Contents

Advertisement

5 Installation
Device
GTW-08 (optional)
GTW-21 BACNet (optional)
BLE Smart Antenna
GTW-30 (optional)
5.6.2

Connecting the system pump

Fig.32
System pump
2
5.6.3

The CB-01 connection PCB

Fig.33
Connection PCB CB-01
X5
X4
IN
X2
X9
Pump
X3
N
L
PWM
Pump
N
L
0
+
Fig.34
Flue gas valve
N L
Fig.35
PWM system pump
PWM
-
+
28
1
3
5 5
4 4
3 3
2 2
1 1
N
L
X00
AD-3002657-01
X6
S-Bus
OUT
X10
0-10
On/off
Tout
OT
BL
RL
0
+
AD-3000672-03
AD-3001306-01
AD-3001307-01
Primary location
13
13
14
14
1. Undo the screws on both sides of the cover.
2. Remove the cover.
3. Connect a pump to the X00-4 and X00-5 terminals of the connector
block.
Important
The maximum power consumption is 300 VA.
You can change the post run time and speed of the pump with parameters
PP015, PP016 and PP018.
See also
Connecting a PWM system pump, page 28
The CB-01 is placed in the control box. It provides easy access to all the
standard connectors.
Connecting a flue gas valve
1. Connect a flue gas valve to the Pump terminals of the connector.
You can change the wait time of the flue gas valve with parameter AP003.
Connecting a PWM system pump
A PWM system pump can be connected to the boiler and can be
controlled in a modulating way from the boiler
1. Connect the PWM pump to the PWM terminals of the connector.
Important
Contact us for more information.
Location option
8 / 14
8 / 14
8 / 13
8 / 13
7837114 - v.01 - 10012023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 210 ace 120Gas 210 ace 160Gas 210 ace 200

Table of Contents