INSTALLATION INSTRUCTIONS

7.1 General

All gas appliances must, by law, be installed by a competent qualified engineer
registered with CORGI and holding the relevant qualifications and certificates (for
example ACOPS and IEE regs.)
The complete installation must comply with the current editions of relevant British
Standards and codes of practice, including the latest local and national regulations for
this type of equipment.
Important:
The Remeha Quinta 45 and 65 are CE certified applianced and must not therefore
be modified or installed in any way contrary to these "Installation and Maintenance
Instructions".
These manufactures Instructions must NOT be taken as overriding statutory
obligations. Failure to install this appliance correctly could result in an unsafe condition
which can lead to prosecution. It is your own interest and that of safety to ensure that
the law is comlied with.

7.2 Location

The remeha Quinta 45 and 65 are
primarily designed for wall mounting (on
the bracket supplied). The wall should
be flat, vertically plumb and capable of
supporting the full weight of the boiler full
of water. An optional floor frame can be
used for a free standing installation or
where the wall cannot carry the weight.
The following minimum clearances are
required:
- Front: 600 mm (25 mm if mounted
behind door)
- Sides: 25 mm
- Bottom: 250 mm
- Top: 400 mm.
55979.indd 32
55979.indd 32
Quinta 45/65
Fig. 05
Minimum clearances around
the boiler
05W4H7900003
32
Remeha
2-4-2009 9:42:39
2-4-2009 9:42:39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quinta 65

Table of Contents