11. Press and hold the On button until you hear the UPS beep
NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term storage.
NOTE If you installed optional EBMs, ensure maximum battery runtime by using the ERM
configuration tool on the Software Suite CD.
NOTE If more than two EBMs are installed, an external battery charger is recommended
for faster recharge times.
Remote Emergency Power-off Installation
The Powerware 5125 includes a REPO port that allows power to be
switched off at the UPS output receptacles from a customer-supplied
switch in a remote location.
The REPO feature shuts down the protected equipment immediately
and does not follow the orderly shutdown procedure initiated by any
power management software.
Any devices that are operating on battery power are also shut down
immediately. When the REPO switch is reset, the equipment will not
return to battery power until the UPS is manually restarted.
If the Off
remains in Standby mode when restarted until the On button is
pressed.
®
EATON Powerware
5125 Two-in-One UPS (2400/3000 VA) User's Guide
(approximately one second).
μ
The
indicator illuminates solid and the load level indicators
display the percentage of load being applied to the UPS. The UPS is
now in Normal mode and supplying power to your equipment.
To change the factory-set defaults, see "Configuration" on page 37.
button is pressed after the REPO is activated, the UPS
INSTALLATION
S
164201383 Rev C www.power-
ware.com
29