Displaying And Maintaining Track Object(S); Track Configuration Examples; Static Routing-Track-Nqa Collaboration Configuration Example - 3Com 4210G Series Configuration Manual

24-port/48-port
Hide thumbs Also See for 4210G Series:
Table of Contents

Advertisement

Displaying and Maintaining Track Object(s)

To do...
Display information about the
specified Track object or all
Track objects

Track Configuration Examples

Static Routing-Track-NQA Collaboration Configuration Example

Network requirements
The next hop of the static route from Switch A to Switch C is Switch B.
Configure Static Routing-Track-NQA collaboration on Switch A to implement real-time monitoring
of the validity of the static route to Switch C.
Figure 7-2 Network diagram for Static Routing-Track-NQA collaboration configuration
Vlan-int3
10.2.1.1/24
Vlan-int3
10.2.1.2/24
Switch A
Configuration procedure
1)
Configure the IP address of each interface as shown in
2)
Configure a static route on Switch A and associate it with the Track object.
# Configure the address of the next hop of the static route to Switch C as 10.2.1.1, and configure the
static route to associate with Track object 1.
<SwitchA> system-view
[SwitchA] ip route-static 10.1.1.2 24 10.2.1.1 track 1
3)
Configure an NQA test group on Switch A.
# Create an NQA test group with the administrator admin and the operation tag test.
[SwitchA] nqa entry admin test
# Configure the test type as ICMP-echo.
[SwitchA-nqa-admin-test] type icmp-echo
# Configure the destination address as 10.2.1.1
[SwitchA-nqa-admin-test-icmp-echo] destination ip 10.2.1.1
# Configure the test frequency as 100 ms.
Use the command...
display track
{ track-entry-number | all }
Switch B
Vlan-int2
10.1.1.1/24
Vlan-int2
10.1.1.2/24
Switch C
Available in any view
Figure
7-2.
7-4
Remarks

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4210g nt4210g pwr

Table of Contents