Dhcp Test Configuration Example - 3Com 4210G Series Configuration Manual

24-port/48-port
Hide thumbs Also See for 4210G Series:
Table of Contents

Advertisement

NQA entry(admin admin, tag test) test results:
Destination IP address: 10.2.2.2
Send operation times: 10
Min/Max/Average round trip time: 2/5/3
Square-Sum of round trip time: 96
Last succeeded probe time: 2007-08-23 15:00:01.2
Extended results:
Packet lost in test: 0%
Failures due to timeout: 0
Failures due to disconnect: 0
Failures due to no connection: 0
Failures due to sequence error: 0
Failures due to internal error: 0
Failures due to other errors: 0
Packet(s) arrived late: 0
# Display the history of ICMP echo tests.
[DeviceA] display nqa history admin test
NQA entry(admin admin, tag test) history record(s):
Index
Response
370
3
369
3
368
3
367
5
366
3
365
3
364
3
363
2
362
3
361
2

DHCP Test Configuration Example

Network requirements
Use the NQA DHCP function to test the time necessary for Switch A to obtain an IP address from the
DHCP server Switch B.
Figure 24-4 Network diagram for DHCP
NQA client
Vlan-int2
10.1.1.1/16
Switch A
Configuration procedure
# Create a DHCP test group and configure related test parameters.
<SwitchA> system-view
[SwitchA] nqa entry admin test
Status
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
Succeeded
DHCP server
Vlan-int2
10.2.2.2/16
IP network
Switch B
Receive response times: 10
Time
2007-08-23 15:00:01.2
2007-08-23 15:00:01.2
2007-08-23 15:00:01.2
2007-08-23 15:00:01.2
2007-08-23 15:00:01.2
2007-08-23 15:00:01.2
2007-08-23 15:00:01.1
2007-08-23 15:00:01.1
2007-08-23 15:00:01.1
2007-08-23 15:00:01.1
23-24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4210g nt4210g pwr

Table of Contents