Mounting The Expansion Cabinet (Eksu2) - Vodavi Starplus Triad 1/2/3 Installation Manual

Feature package 3
Table of Contents

Advertisement

KSU & Power Supply (PSU) Installation
5. Remove the front cover by turning the two front cover screws ½ turn
6. Tilt and lift the cover to remove.
The KSUs require intercommunications which are provided by the KSU
Data Cable shipped with each EKSU.
1. Connect the cable to the back plane of both KSUs by a 25-pair
2. Install the cable through the Basic KSU where the Cable Cover Plate
3. Insert the 25-pair connector at each end of the cable in the connector

Mounting the Expansion Cabinet (EKSU2)

The Expansion KSU2 is mounted directly on the right of the BKSU.
1. Before mounting the Expansion KSU2 on the screws, remove the KSU
2. Remove the two screws holding each plate and lift the plate from the
3. Mark the location of the four mounting screws.
4. Drill pilot holes in the four locations marked, insert and tighten the
5. Mount the Expansion KSU on the screws and tighten the screws
counter clockwise.
connector.
was removed into the Expansion KSU.
on the back plane of each KSU.
Interconnect Cable Cover Plate on the right side at the rear right of
the BKSU.
BKSU. (Refer to
Figure
screws leaving about ½ inch exposed.
securely.
The KSUs require intercommunications which are provided by the
KSU Data and Power Cables shipped with each EKSU2. The KSU cable
is connected to the back plane of both KSUs by a 25-pair connector
and 20 wires power cable.
3-2.)
3-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Starplus triad 1Starplus triad 2Starplus triad 3

Table of Contents