Site Preparation
Verify On-Site Equipment
Once the equipment installation site has been identified and a dedicated
AC outlet, earth ground, and lighting and ventilation are available, verify
that all equipment required is on-site and has not been damaged during
shipment. Unpack the KSUs and the PSUs and assure there is no shipping
damage.
A mounting template is packed with each KSU, and this template is
required later in the installation. Check that the type and quantity of
boards receive is correct and optional equipment and a Power Line Surge
Protector are on-site.
The individual boards SHOULD NOT be unpacked at this time. If any
equipment is damaged or missing, notify the appropriate personnel to
correct the situation.