Discharge Roller Drive Assembly - Lexmark Optra C Service Manual

Service manual
Hide thumbs Also See for Optra C:
Table of Contents

Advertisement

5045-001
Reassembling Tips:
1. Install the front bearing first. Locate the bearing in position.
While applying slight inward pressure to the bearing, rotate the
center shaft until the pin in the bearing lines up with the slot in
the center shaft.
2. Before installing the sensor bracket, rotate the drum drive gear
so the tab is in the 12 o'clock position.
3. Be sure the tabs on the rotary knob are lined up with the slots in
the front panel before securing the panel.
4. When installing the ducts, be sure the HVPS wires are
separated in the wire guides on this lower duct.

Discharge Roller Drive Assembly

See Assembly 18-1.
For cover removals, see
1. Remove the top cover.
2. Remove the left side cover and the rear cover.
3. Remove the EMC shield from the rear of the machine.
4. Open the multipurpose paper pickup door.
5. Release the two green cassette latches and slide the tray out as
far as possible.
6. Remove the connector cover (Asm 8-24) and disconnect the
connector.
7. Remove the LVPS.
8. Disconnect connector (J2014) from the mechanical controller
PCB.
9. Remove the four mounting screws to the drive gear solenoid
assembly and remove the assembly. Disconnect the remaining
2-pin connector from the frame.
10. Remove the two screws from the discharge roller drive
assembly and remove the assembly.
"Cover Removals" on page
4-8.
Repair Information 4-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optra c series

Table of Contents