Advertisement

T1/PRI Review
5. Under the Installation heading:
a. Write the "Due Date" on which the installation is scheduled to be
complete.
b. Write the date the equipment is scheduled for delivery to the customer
in the Materials-on-Job Date space.
6. Under the Installation Contacts heading, list the names and telephone
numbers of the personnel responsible for the equipment order and its
installation:
a. (Order) Implementor
b. NTM Manager
c. National Technical Service Center (NTSC) Engineer
d. Data Services Organization (DSO) Manager
7. Under the question about whether the order has been placed:
If the order has been placed, check the Yes box and fill in the date.
If the order has not been placed, check the No box.
8. On page 2, complete one box for each 100D module by transferring the
options information for each module from the corresponding box on Form
3b (page 1):
a. Service Ordered or Planned (Type of Service)
b. Frame Format
c. Line Coding (Suppression)
d. Line Signaling Mode
e. Synchronization Timing (Clock Synchronization: Source).
9. To ensure that the synchronization integrity of the network both this
communications system and its far-end connections is protected,
prepare the Network Planning Map on page 3 for review by NTM.
Describe the entire network of DS1 facilities by summarizing the following
for each 100D module:
a. Fill in the control unit slot number(s) of the 100D modules connected
to the CSU(s).
b. Write the approximate number of cable feet between each module
and its CSU or far-end connection (refer to the Line Compensation
entry on Form 3b, Page 1).