Programming Equipment - Lucent Technologies MERLIN LEGEND Release 7.0 System Planning Manual

Hide thumbs Also See for MERLIN LEGEND Release 7.0:
Table of Contents

Advertisement

MERLIN LEGEND Communications System Release 7.0
System Planning 555-670-112
2
Control Unit Configuration
Recording System Operating Conditions
A reminder to set the system date
Backup schedule
Identifying system console extensions
Second Dial Tone Timer
Identifying system applications
Forms Needed
Form 1, System Planning

Programming Equipment

Two types of equipment can be used for system programming:
An MLX-20L telephone identified as a system programming console. The
telephone is connected to the first (lowest) extension jack (which is factory-
set for system programming) on the first MLX module.
A personal computer with System Programming and Maintenance (SPM)
software. The PC connects to the lowest jack on the processor module.
Planning Form Instructions
1.
Under the Programming Equipment heading in the System Operating
Conditions section on Form 1 (page 2), do either of the following:
NOTES:
If the system will use a system programming console, check the
System Programming Console box.
If the system will use a PC with SPM software, check the PC with
SPM Software box.
In conjunction with the MLX-20L telephone and the PC, a PCMCIA card
is required for Release 3.0 and later of the communications system.
Check the box labeled PCMCIA Memory Card.
The first (lowest) extension jack on the first MLX module is factory-set
for system programming and as the primary operator position. Since the
primary operator position cannot be reassigned, you may want to
change the system programming assignment to ensure that future
programming sessions do not interfere with the operator's work.
2
Issue 1
April 1999
2-8
2
2

Advertisement

Table of Contents
loading

Table of Contents