KYBD
Mouse
Video
Mounting the
NBX Gateway Chassis
Figure 29 Installing the
USB
Com 1
Com 2
1 Install one screw into each vertical rail of the 19-inch rack. Leave at least
6.5 cm (2.5 inches) above other equipment in the rack.
Do not tighten the screws. Thread them just far enough so that they are
secure. The slots on the bottom of the Call Processor mounting brackets
slip onto these screws.
2 Verify that the Call Processor mounting brackets are securely installed on
the front of the box.
3 Lift the Call Processor and slip the keyed slots of the mounting brackets
onto the two screws you installed in Step 1.
4 Hold the Call Processor in place, install a mounting screw in the top hole
of each bracket, and then tighten all four screws securely.
You are now ready to mount the NBX Gateway Chassis. For an overview
of this chassis, see
The tools, materials, and procedures for rack-mounting the NBX Gateway
Chassis are essentially identical to those for mounting the SuperStack 3
NBX Call Processor. For more detailed information, see
SuperStack 3 NBX System"
Installing the SuperStack 3 NBX System
SuperStack 3
NBX Call Processor
V
o
Ethernet 1
Ethernet 2
l
MOH
Paging
"SuperStack 3 NBX Gateway Chassis"
on
page
74.
NBX Call Processor
External
Alert
SuperStack 3 NBX
R
in
"Installing the
75
Chapter
1.
Need help?
Do you have a question about the 3C10111C - NBX 100 - Modular Exp Base and is the answer not in the manual?
Questions and answers