5
Installation
5.1
Scope of Delivery
Item
Device
Weighing pan
Frame draft shield
Power supply unit with country-specific
AC adapters
Shock absorber
Operating Instructions
5.2
Selecting an Installation Site
Procedure
Make sure that the following conditions are met at
t
the installation site:
Condition
Characteristics
Ambient conditions
Suitability tested (see
Chapter 14.1, page 47 for
ambient conditions)
Setup surface
− Stable, even surface with
− Sufficient space for the
− Sufficient load-bearing
Quantity
1
1
1
1
4
1
little vibration
device (for space
requirements, see Chapter
"14.10 Device Dimensions",
page 50)
capacity for the device and
peripheral devices (see
Chapter "14.12 Metrological
Data", page 51 for
device weight)
5.3
Unpacking the Device
Procedure
Unpack the device.
t
Install the device at the intended installation site.
t
We recommend keeping the original packaging to
t
return the device securely and appropriately, e.g. for
repairs.
5.4
Removing the Transport Lock
Procedure
1
5.5
Mounting the Device
Procedure
5.6
Acclimatizing
When a cold device is brought into a warmer area: The
temperature difference can lead to condensation of
humidity in the device (moisture formation). Moisture in
the device can lead to malfunctions.
Procedure
Allow the device to acclimatize for approx. 2 hours at
t
the installation site. Ensure that the device is
disconnected from the power supply during that
time.
Entris
II Advanced Line Operating Instructions
®
Installation
Remove the
t
transport locks (1)
and retain them for
later use.
Place the frame
t
1
draft shield (3) on
the balance.
2
Attach the four
t
3
shock absorbers (2).
Place the weighing
t
pan (1) on top.