TRANSMISSION SWITCH
Transmission Switch - Circuit Breakout
Testing
1.
With the switch installed, use an ohmmeter to test
continuity between the switch leads and engine ground.
2.
First, shift the transmission into "neutral" and test for
continuity between the DG/WH wire and ground.
3.
Then shift the transmission into "reverse" and test for
continuity between the DB wire and ground. In both tests
you should have continuity to ground.
Removal
1.
Remove the CVT cover. The indicator switch will be
visible between the drive and driven clutch. Refer to CVT
Chapter for CVT cover removal and installation.
2.
Remove the (2) screws and pull on switch to release from
crankcase.
ELECTRICAL
8
8.7