User's Manual of IGS-6325 series
Figure 2-10 Wires DI0 and DI1 to Open Detector
4.
There are two Digital Output groups for you to sense INDUSTRIAL MANAGED SWITCH port failure or power failure and
issue a high or low signal to external device. The following topology shows how to wire DO0 and DO1.
Figure 2-11 Wires DO0 and DO1 to Open Detector
32