JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
Symbol
Change History
Changes between document issues are cumulative. The latest document issue
contains all updates made in earlier issues.
Issue 02 (2023-09-30)
Added the low-voltage (LV) coupling scenario where the inverter and PCS are
connected to the same MCCB.
●
●
●
●
●
●
●
Issue 01 (2023-01-30)
This issue is used for first office application (FOA).
Issue 02 (2023-09-30)
Description
Supplements the important information in the main text.
NOTE is used to address information not related to personal
injury, equipment damage, and environment deterioration.
Added the LV coupling scenario where the inverter and PCS are connected to
the same MCCB in
Networking
Added the exterior of the JUPITER-(3000K,6000K,9000K)-H1 in the LV
coupling scenario where the inverter and PCS are connected to the same
MCCB in
2.2
Appearance.
Added the networking and component configuration description in the LV
coupling scenario where the inverter and PCS are connected to the same
MCCB in
2.5 Scenario-based
Updated
6.8.3 Replacing an
Added
Inverter and PCS Status Check (Applicable to LV Coupling
Scenarios Where the Inverter and PCS Are Connected to the Same
Added
Powering On Inverters, PCSs, and the DTS (Applicable to LV
Coupling Scenarios Where the Inverter and PCS Are Connected to the
Same
MCCB).
Added
6.6 Maintaining Inverters and PCSs (Applicable to LV Coupling
Scenarios Where the Inverter and PCS Are Connected to the Same
Copyright © Huawei Technologies Co., Ltd.
Application.
Configurations.
SPD.
About This Document
MCCB).
MCCB).
iii