Step 5 Manually turn on the circuit breaker of cabinet G2 in the ring main unit.
Step 6 Manually turn on the ground knife switch of cabinet G2 and lock the operation
hole. Install a sign to forbid any operation.
Step 7 Manually turn off all MCCBs of the incoming cables and discharge the busbar of
the LV cabinet using a ground cable.
Figure 6-2 Status of the switches after overhaul