Huawei JUPITER-3000K-H1 Smart User Manual page 116

Transformer station
Hide thumbs Also See for JUPITER-3000K-H1 Smart:
Table of Contents

Advertisement

JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
No.
Check Item
5
Cable
connection
6
LV panel
Issue 02 (2023-09-30)
Check Method
Check that power cables and
signal cables/copper bars are
securely connected. If not,
properly connect them according
to specified torques.
Check that cable holes are
properly sealed. Ensure that there
is no gap.
Check that power cables and
control cables are not damaged
and that the cable exterior in
contact with the metallic surface
is not scratched.
Check that the insulation binding
tapes on the wiring terminals of
power cables are intact.
Check the polyurethane foam at
the air intake vent of the LV panel.
If the foam is damaged, take a
new foam out of the fitting bag,
cut and install it using adhesive to
fill the gap between the air intake
vent and the door of the container
LV room to avoid air leakage. This
ensures good heat dissipation of
the LV panel.
NO TE
For details about how to maintain equipment in the STS, see the corresponding documents.
Copyright © Huawei Technologies Co., Ltd.
6 System Maintenance
Recommended
Maintenance Interval
Six months after the
first commissioning
and once every two
years after that
Once every 10 years
System
Power
ed Off
or Not
Yes
Yes
Yes
Yes
No
108

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jupiter-6000k-h1 smartJupiter-9000k-h1 smart

Table of Contents