Huawei JUPITER-3000K-H1 Smart User Manual page 17

Transformer station
Hide thumbs Also See for JUPITER-3000K-H1 Smart:
Table of Contents

Advertisement

JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
Issue 02 (2023-09-30)
Ensure that the site complies with local laws, regulations, and related
standards.
Ensure that the ground in the installation environment is solid, free from
spongy or soft soil, and not prone to subsidence. The site must not be located
in a low-lying land prone to water or snow accumulation, and the horizontal
level of the site must be above the highest water level of that area in history.
Do not install the equipment in a position that may be submerged in water.
If the equipment is installed in a place with abundant vegetation, in addition
to routine weeding, harden the ground underneath the equipment using
cement or gravel.
Before opening doors during the installation, operation, and maintenance of
the equipment, clean up any water, ice, snow, or other foreign objects on the
top of the equipment to prevent foreign objects from falling into the
equipment.
When installing the equipment, ensure that the installation surface is solid
enough to bear the weight of the equipment.
All cable holes must be sealed. Seal the used cable holes with sealing putty.
Seal the unused cable holes with the caps delivered with the equipment. The
following figure shows the criteria for correct sealing with sealing putty.
After installing the equipment, remove the packing materials such as cartons,
foam, plastics, and cable ties from the equipment area.
Copyright © Huawei Technologies Co., Ltd.
1 Safety Information
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jupiter-6000k-h1 smartJupiter-9000k-h1 smart

Table of Contents