JUPITER-(3000K, 6000K, 9000K)-H1 Smart
Transformer Station
User Manual
No.
Running Parameter
43
UPS
44
DC LV Panel
45
Quantity of
distribution
transformers
----End
6.8.16 Replacing Measurement and Control Modules
The JUPITER-3000K-H1 is configured with two measurement and control modules.
Measurement and control module 1 is located in LV PANEL A, and measurement
and control module 3 is located in the MV room.
The JUPITER-6000K-H1 and JUPITER-9000K-H1 are configured with three
measurement and control modules. Measurement and control module 1 is located
in LV PANEL A, measurement and control module 2 is located in LV PANEL B, and
measurement and control module 3 is located in the MV room.
6.8.16.1 Replacing a Measurement and Control Module in the LV Room
Context
If a measurement and control module is found damaged during maintenance,
power it off and replace it.
The positions of measurement and control modules in an STS vary with the model,
but the replacement procedures are the same. This section uses the replacement
of the measurement and control module in LV PANEL A as an example.
Power-Off
Replace measurement and control module 1 (CK1).
Issue 02 (2023-09-30)
Description
Select Yes or No based on
the actual configuration.
Select Yes or No based on
the actual configuration.
Set this parameter based on
the actual configuration.
Copyright © Huawei Technologies Co., Ltd.
6 System Maintenance
Associated
Associated
Teleindication
Telemetering
Signal
Signal
– UPS AC power
-
failure alarm
– Other UPS
alarms
DC LV Panel door
-
opening
– Switch-on of
-
MCCB for
distribution
transformer n
– Distribution
transformer n
heat exchanger
fault
– Distribution
transformer
cabinet door
opening
190