Figure 6-66 Positions of the the ring main unit switches (using the DVC as an
example)
(1) Ground switch of cabinet G2
(3) Remote/Local switch of cabinet G2
Procedure
Step 1 Ensure that the STS has been powered off and the new ring main unit has been
transported to the site.
Step 2 Remove AC power cable connectors and wrap the connectors with a clean plastic
bag to keep the connectors clean.