With the ISDN connections and base unit connections completed, the NetPath 100 is
ready to be powered on and the ISDN Adapter configured for operation.
Power the unit on by connecting the power cord and plugging it into an appropriate AC
outlet. The NetPath 100 with ISDN will complete its power-on self-test sequence with
front panel LED indications as follows:
a. The POWER LED will light immediately and stay on.
b. The READY and ISDN READY LEDs will flash while the unit
performs its self-test (test duration - approximately 45 seconds).
c. The READY and ISDN READY LED will be ON steady after suc-
cessful completion of the self-test.
d. The T1 ALARM and FR MGMT. LEDs should not be flashing
together.
e. All other LED indications should be ignored until configuration has
been completed.
If the LED indications are not as described above, refer to section 5 Diagnostics of this
manual.
If operation looks normal, proceed by establishing a Management Session and entering
the operating parameters as described in Parameter Setting on the next pages of this
section in the manual, or contact the Network Control Center to have the parameters
set remotely.
NOTE: If the Dial Line has not been connected to the NetPath 100 prior to powering
the unit on, the unit will issue a Dial Line Failure In-Band Trap to the Trap Manager
after it completes its Modem and Dial Line self test.
NetPath 100 User's Manual - Installation Guide