Preventive Maintenance Plan - Pmp 582350110 - SAMES KREMLIN Cyclix 200 L Instruction Manual

Table of Contents

Advertisement

6.2. Preventive maintenance plan - PMP 582350110

see § 10.1 page 108
The proposed preventive maintenance plan aims to define in an exhaustive way, the actions of checking, replacement
and cleaning of the installed Sames equipment.
In order to anticipate breakdowns and malfunctions that may be due to technical deviations of the installation, the
preventive maintenance plan annexed to the user's manual recalls the routine maintenance operations necessary for
a better comfort in the use of the production tool.
Depending on the skills, area of responsibility and clearance of each person involved, the preventive maintenance
plan can be divided into two distinct levels: level 1 and level 2:
• Level 1: first level maintenance is essentially composed of visual control and cleaning operations of some
elements of the equipment. To limit this level, only the specific tools provided with the equipment will be used.
This first level of maintenance is generally taken care of by paint operators or installation managers.
• Level 2: the second level maintenance completes the first level by more complex disassembly operations
requiring electrical engineering tools.
This second level is generally handled by the factory maintenance department.
Member of Exel group
38
DRT582350110
A - 2023/10

Advertisement

Table of Contents
loading

Table of Contents