Every Twenty-Four (24) Months - GE 9100c Technical Reference Manual

Anesthesia machine
Table of Contents

Advertisement

6.2.2 Every twenty-
four (24) months
M1207026
M1207027
Reproduced from the electronic master in MATRIX
6. Flow control tests (Section 3.4)
7. Pressure relief tests (Section 3.5)
8. Vaporizer back pressure test (Section 3.8)
9. Low-pressure leak test (Section 3.9)
10. Airway pressure gauge accuracy check (Section 5.4)
11. Alarm tests (Section 3.10)
12. Breathing system tests (Section 3.11)
13. Power failure test (Section 3.12)
14. Electrical safety tests (Section 3.13)
In addition to the 12-month requirements, replace the following parts
every 24 months. All machine and ventilator parts should be replaced
before performing the checks, tests, and calibrations.
1. Replace the free breathing flapper valve.
2. Replace the free breathing valve o-ring.
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English
6 Installation and Maintenance
6-5

Advertisement

Table of Contents
loading

Table of Contents