GE 9100c Technical Reference Manual page 74

Anesthesia machine
Table of Contents

Advertisement

9100c
CAUTION
WARNING
Without ACGO
3-16
M1207027
Reproduced from the electronic master in MATRIX
If the needle valve is not fully open, this test can damage
the pressure gauge on the test device.
6. Open the O
flow control and set a total flow of 0.4 L/min through
2
the flowmeter on the test device.
7. Make sure that the pressure gauge on the test device reads zero
and that all other flow controls are fully closed.
8. Close the needle valve on the test device until the test gauge
reads:
ISO 5358 (1001-8976-000)
9. If the flow through the test device is less than 0.35 L/min,
there is a low-pressure leak in the anesthesia machine.
10. Fully open the needle valve on the test device to decrease the
back pressure.
11. Test each vaporizer for low-pressure leaks:
Set the vaporizer to 1%.
Repeat steps 5 through 10.
Turn the vaporizer Off.
12. Remove test tool.
13. Replace the breathing system.
Agent mixtures from the low-pressure leak test stay in the
system. Always flush the system with O
pressure leak test (1 L/min for one minute).
Turn Off all vaporizers at the end of the low-pressure leak
test.
14. Flush the system with O
Set the O
flow to 1 L/min.
2
Continue the O
Turn the O
flow control fully clockwise (closed).
2
1. Turn all flow controls fully clockwise (closed).
2. Remove the breathing system.
3. Connect the test adapter port 1 to the common gas outlet.
4. Connect the test device to the test adapter port 2.
004
MANUAL−DOC, Technical Reference Manual, Technical Reference Manual for 9100c, English
3 kPa
after the low-
2
:
2
flow for one minute.
2
M1207026

Advertisement

Table of Contents
loading

Table of Contents