Section 5 – Procedures
9. Use the bolts and washers removed earlier to
secure the front rollers.
10. Push the platform in all the way.
11. Use a screwdriver to open the mast electrical
housing so you can see the wire connections.
12. Connect the limit switch wires to the mast
electrical housing. Refer to section
Switch
for the correct wire connections.
13. Connect the platform control cable to the mast
electrical housing.
241914ACA
76
5.2-3 Replace the Load Cells
1. Remove the platform. Refer to section
Remove the
2. Remove and set aside the bolts, washers and
spacers from the three load cells. Make a note of
which load cells had spacers.
3.12 Base Limit
3. Discard the old load cells and junction box
assembly.
Platform.
SJ12 E, SJ16 E, SJ20 E
Platform
5.2-1