Skyjack SJ12 E Service Manual page 93

Vertical mast lifts
Hide thumbs Also See for SJ12 E:
Table of Contents

Advertisement

Platform
Install the mast cable
1. Insert the end of the mast cable without the
housing down mast 4 (SJ12 E) or 5 (SJ16/20 E)
and out through the base of the mast.
SJ12 E, SJ16 E, SJ20 E
2. The mast cable has tape markers at specific
intervals so you know where to clamp it on the
cable carriers.
3. Use three of the cable clamps removed earlier to
secure the mast cable to the cable carrier in three
places. The marked part of the cable is clamped
at the center top point of the cable carrier.
4. Lower the rest of the mast cable down mast 4/5
so you can install the next mast section.
Section 5 – Procedures
241914ACA
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj16 eSj20 e

Table of Contents