Platform
13. Slowly pull the loose mast cable upwards. There
will be four steel weighted rollers at the bottom of
each cable coil. Set the steel weights and mast
cable aside.
14. Use hoist rings and lifting straps in opposite
corners to raise the outer mast until the bottom of
the mast is visible.
SJ12 E, SJ16 E, SJ20 E
15. Remove and discard the rear wear pads and
thread rolling screws from the bottom of the mast.
16. Drill out the pope rivets. Remove and discard the
front wear pads from the bottom of the mast.
Section 5 – Procedures
241914ACA
89