Section 5 – Procedures

5.5-3 Program the tilt switch

1. Pull the emergency stop on the base control
console. Turn the main disconnect switch to the
on position.
Power on the MEWP .
Results: The red and green lights flash
repeatedly.
2. Press and release the set zero button 3 times.
3. Monitor the program delay/stabilization time.
Results: Only the red LED blinks for 4 seconds.
4. Both LEDs flash for 1 second.
Results: The switch is learning the new zero
position.
241914ACA
106
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
5. Both LEDs turn on solid for 1 second.
Results: The new zero position has been
learned.
6. The green LED flashes and then the red LED
turns solid for 2 seconds.
Results: The switch is verifying the new zero
position.
Red LED
Green LED
7. The green LED turns on solid.
Results: The switch is ready for normal
operation.
8. Do all of the function tests given in your unit's
Operation manual.
Tilt Switch
Red LED
Green LED
Red LED
Green LED
Red LED
Green LED
SJ12 E, SJ16 E, SJ20 E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj16 eSj20 e

Table of Contents