Skyjack SJ12 E Service Manual page 73

Vertical mast lifts
Hide thumbs Also See for SJ12 E:
Table of Contents

Advertisement

Platform
10. Use a suitably rated lifting device to pull the
platform out fully. Set it aside on a protective
surface.
11. Disconnect the mast cable from the junction box
cable.
SJ12 E, SJ16 E, SJ20 E
12. Remove the bolts and nuts that secure the lower
platform to the mast.
13. Make sure the load cells stay attached to the
mast.
14. Remove and set aside the hardware from the
junction box.
15. Put the junction box on the chassis.
Section 5 – Procedures
241914ACA
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj16 eSj20 e

Table of Contents