Tower Management - ProMinent DULCOMETER Installation And Configuration Manual

Measuring and control unit aegis s for cooling water applications
Table of Contents

Advertisement

General Menu

7.2.1 TOWER MANAGEMENT

58
Fig. 64: Menu settings
In this menu the tower management can be configured.
Fig. 65: Menu tower management
The menu shows an overview of configured timers.
Force Power ON for
Activate the relay when it need to inject
biocide cycle
biocide event if it's out of "normal" running
cycle of the tower, and keep it activated
during all biocide cycles.
Complete active bio‐
If selected, when the operating timer arrive
cide cycle before
to the end of the active timer, if a biocide
Power OFF
cycle is in process, the controller keep the
relay active until the end of the biocide
cycle.
Remote Control OFF
If selected, when the tower management
stop operating timer
remote control is remove during an oper‐
ating timer slot, the relay is disable event is
the timer cycle is not finish.
MTWTFSS
Selection of the day(s) of the week timer
will be active. Type of "multiple" selection,
press desired days to select/deselect.

Advertisement

Table of Contents
loading

Table of Contents