6.2 Operating Graph

An orange arrow indicates a maintenance task is
scheduled on that date. A red arrow indicates a
maintenance task was planned on that date but it
was either not carried out or indicated as carried
out.
A green arrow indicates the current day.
Planned mainte‐
Indicates the number of planned mainte‐
nance tasks this
nance tasks (performed or not) in the
month
month displayed on the calendar.
View the list
Displays a list of all planned maintenance
tasks.
Fig. 28: Operating graph
Display Mode and Type
33