UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Figure 4-6 Mounting holes (unit: mm)
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion bolts in the holes.
Figure 4-7 Expansion bolt composition
(1) M12 bolt
Knock the expansion bolt into the hole until the expansion sleeve completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Issue 06 (2023-08-25)
(2) Spring washer
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(3) Flat washer
(4) Expansion sleeve
83