UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Context
Perform system commissioning and power-on strictly according to the system
manual and ATS instructions. For any changes in operations and parameters,
consult technical support. Otherwise, system commissioning or power-on may fail,
or even the cabinet is damaged.
Procedure
Step 1 Switch on all SPD circuit breakers in the integrated UPS.
Step 2 Switch on the upstream power input circuit breaker for the integrated UPS to
power on the UPS. If the power indicator in the upper part of the integrated UPS
lights up, the UPS is powered on properly.
Step 3 Turn on the circuit breakers of the ATS operation mechanism (Q1 and Q2 in the
left lower part at the rear of the cabinet) to power on the ATS.
Step 4 Check whether the ATS controller has alarms. If an alarm exists, rectify the fault
first.
Step 5 Press the locking latch on the ATS panel, pull out the handle, and insert it into the
slot.
Step 6 Check the ATS Motor/Manual selection lever, and flip it to the Motor (M) mode.
Step 7 Check the AC input and configuration status of the ATS.
After the AC input is normal, the ATS controller starts. Check and set ATS
parameters based on the AC input parameters.
Issue 06 (2023-08-25)
CA UTION
NO TE
● A password is required to log in to the configurations page. Set the password by using
the Up, Down, and Enter buttons. The initial password is 0001.
● Language setting: Default screen > Main Menu > Device Configuration > Language
On the default screen, press
main menu screen, select system configuration and press
The following table lists the system configuration attributes and values.
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Power-On and Commissioning
to enter the main menu screen. On the
.