UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Figure 4-23 Removing insulation panels
Step 3 Connect a ground cable to the UPS cabinet.
● Before connecting cables, ensure that all UPS input switches are turned off.
● You need to prepare terminals onsite. The length of the copper wire should be
Figure 4-24 Grounding
Issue 06 (2023-08-25)
NO TICE
the same as that of the part of the terminal that covers the conductor.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
96