Huawei UPS5000-E User Manual page 201

Integrated ups 3.0
Hide thumbs Also See for UPS5000-E:
Table of Contents

Advertisement

UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
No.
Check Item
6
Ambient
humidity
Product Component Checklist
No.
Check Item
1
Installation
2
Appearance
3
Cabinet cable
hole
protection
4
Air outlet
Issue 06 (2023-08-25)
Acceptance Criteria
Actual humidity: ______%
RH (0%–95% RH, non-
condensing)
Acceptance Criteria
The equipment is installed
properly and arranged
neatly, and screws are
tightened.
● Wipe the device surface
using a white paper
and the paper does not
turn black.
● The equipment is not
rusty or deformed.
The cable holes of the
cabinet have been fully
sealed using the standard
sealing plates, and rodent-
proof measures are taken.
The air outlet is not
blocked.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Check Method and
Troubleshooting
● Check method:
Measure using a
hygrothermograph.
● Troubleshooting: Check
that the air conditioner
runs properly.
Check Method and
Troubleshooting
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault
according to the
acceptance criteria.
Clean up the dust on
the air filter or replace
the air filter during
dust removal.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
7 Maintenance
Check
Interval
Monthly
Check
Interval
Monthly
Quarterly
Quarterly
Quarterly
193

Advertisement

Table of Contents
loading

Table of Contents