Global Licence 2 Installation Manual page 92

Table of Contents

Advertisement

LICENCE INSTALLATION
LTB20 • Tackboard for wall mounted units
Tackboard Instillation
Provides a tackable surface for notes and memos.
Mounting brackets for installation included.
Wall Rails (BHV01 and BHV02) must be ordered separately. Please see the
Boulevard Systems Pricelist.
Tackboard are to be installed directly to an existing wall
using vertical wall rails.
*Installation instruction is shown using BHV01 & BHV02 vertical wall
rails from the Global Contract Boulevard price list. Equivalent wall
mount brackets may be used as long as it uses standard 1" incremental slots
STEP 1: Based on width of the tackboard, see example dimension, vertical
Wall rails are to be attached to the wall.
*Hardware to attach to the wall are not provided and should be selected
Based on the type of wall you are mounting too.
STEP 2: Spacing of the wall rails using the example, measurement
dimension is from slot to slot for placement.
STEP 3: Make sure wall rails are vertical and parallel to each other, insure
that slots are level between rails.
STEP 4: Tackboard is shipped with the hardware installed from the factory.
Install by angling the top into desired slots at appropriate height and
rotate the bottom into position insuring the bottom brackets engage into
the vertical rails.
STEP 5: You may be require to use an mallet to gently tap the top of the
Tackboard to fully engage the brackets.
91
CANADA
Required Tools
Safety Glasses
Screwdriver #2 Phillips
NOTE: Open and assemble only one product at a time to avoid a potential mix-up of
parts and hardware.
It is adviseable to assemble the unit on a carpet to avoid scratches.
Rubber Mallet
BHV01
BHV01
globalfurnituregroup.com

Advertisement

Table of Contents
loading

Table of Contents