Connecting Display Wall to Bridges Tables Display Wall Cable Manager TV/Display Please contact your Global CustomerCare Representative at 800-220-1900 for any questions or concerns. NOTE: Any alterations to listed components will void the manufacturer’s warranty. specifications. In accordance with the manufacturer’s policy of continual product...
BRIDGES II INSTALLATION GUIDE Beam Applications Legs are connected with supporting beams. There is one beam for a single line of tables while two beams connect back-to-back table structures. Adjustable clamps at either end of the beam can be adjusted to accommodate the following applications in both single table as well as back-to-back table configurations.
BRIDGES II INSTALLATION GUIDE Supporting Structure Round Leg Height Adjustment Set the legs to desired height. STEP 3: If the desired top surface height is 29” from the floor, for instance, and the table structure is to be on levelers, align top threaded hole in the inner leg (1) with the The inner leg has two threaded holes.
Page 5
BRIDGES II INSTALLATION GUIDE Supporting Legs and Beams (continued) STEP 3: Position beam’s end bracket over leg’s horizontal, rectangular tube. STEP 4: Secure top and bottom bracket ends with two supplied screws, but do not tighten the bottom screw. Level the whole assembly.
BRIDGES II INSTALLATION GUIDE Telescopic Beam Designed to provide support for worksurfaces perpendicularly connected to a primary table run. The telescopic beam is connected to the leg’s horizontal, rectangular tube on one side, while the opposite side is secured off module to the perpendicular, central beam and can be adjusted to accommodate 24”...
Page 7
BRIDGES II INSTALLATION GUIDE 120° Leg The integrated 120° beam bracket allows for the beam to be mounted in two positions: A) end of run leg placement B) shared leg placement Identify the desired leg position (A or B) STEP 1: Align two mounting holes in beam with two holes in the integrated 120° beam bracket.
BRIDGES II INSTALLATION GUIDE Storage Table Beam Storage table beam’s flexibility allows for a single table application (with the table leg tucked in under the worksurface) as well as for a double table installation (two adjacent tables supported by a shared leg in the middle (A) and two storage cabinets at the opposite ends).
3” BRIDGES II INSTALLATION GUIDE Sliding Return NOTE: Round legs: 3” Sliding Return can be installed anywhere along the front edge of worksurface supported by round legs. Rectangular legs: Sliding Return can be installed along the front edge of worksurface between Rectangular legs.
BRIDGES II INSTALLATION GUIDE Round Table Supports Round table structure consists of one main leg and two individual legs. STEP 1: Put round top upside down on a clean flat surface. STEP 2: Position each individual leg. STEP 3: Secure the legs with supplied screws. Level the whole assembly.
BRIDGES II INSTALLATION GUIDE Power, Data and Cable Management Overview • Wire basket • Above worksurface back-to-back power trough with base feed and ceiling feed • Below worksurface back-to-back power trough with base feed • Ceiling feed • Below worksurface single-sided power trough with base feed •...
BRIDGES II INSTALLATION GUIDE Wire Basket Wire Basket 8” wide basket manages cable excess under single and back-to-back worksurfaces, as well as under storage cabinets. It is suspended on four spring steel brackets so it can be easily unclipped to rearrange cable connections from below the worksurface or below storage units.
Page 13
BRIDGES II INSTALLATION GUIDE Below Worksurface Power Trough Installation STEP 2: Engage Trough’s brackets with the leg’s horizontal beam. Ensure that tab “D” fits over the leg beam. Use tab “E” to locate the bracket against the leg worksurface bracket as illustrated.
Page 14
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Power Trough Electric Components - Below Worksurface Trough Base Feed Power Trough Electric Components - Below Work Surface Trough Base Feed Identify type and location of required electric components and position them in accordance with lay-out plans.
Page 15
BRIDGES II INSTALLATION GUIDE GLOBAL Contract • January 2017 INSTALLATION GUIDELINES Power Trough Electric Components: Continued Power Trough Electric Components : Continued STEP 7: Secure interconnected Electrical Components to Power Troughs: Pro- ceed from the Power Feed by connecting its harness to the Power Distribution STEP 11: Reach around power trough and push down on tab to lock.
Page 16
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Duplex Retainer Removal Duplex Retainer Removal To disassemble, push simultaneously onto the teeth until the retainer comes loose. Once loose, rotate away from duplex and follow opposite of installation (Step 9 &10) in order to remove.
Page 17
BRIDGES II INSTALLATION GUIDE Single Sided Power Trough STEP 1: Identify correct length of Single- sided Power Trough and position it up against the bottom of worksurface so that its shorter lip rests against the table supporting beam. Center it sideways so that its center becomes aligned with the center of the worksurface.
Page 18
BRIDGES II INSTALLATION GUIDE Above Worksurface Power Trough Identify correct length of Above Worksurface Power Troughs and place them on worksurface in their respective locations. Identify type and location of required electric components and position them in accordance with lay-out plans.
Page 19
BRIDGES II INSTALLATION GUIDE Back-to-Back Storage Tower Gap Filler Kit Cover Trough’s installation consists of securing four brackets to worksurfaces immediately adjacent to storage towers. Brackets can be installed in two positions, which determine whether the trough cover is going to function as an Above or Below worksurface trough cover.
Page 20
BRIDGES II INSTALLATION GUIDE BRTDLSHS34 Shroud STEP 1: Complete installation of tables, worksurfaces, power troughs, power outlets and data/communication cables. STEP 2: Remove vertical cable manager from both legs. Engage tabs at either bottom end of the shroud with the groove in the legs (the same groove Vertical Cable Managers snap into).
Page 21
BRIDGES II INSTALLATION GUIDE Ceiling Feed Ceiling feed pole kit consists of a two-part vertical channel and two handed bottom brackets. Ceiling feed pole installation on Above and Below Power troughs is identical. Above trough is illustrated. Ceiling feed harness has already been connected to the Power Distribution Module and data / communication cables, hanging from the ceiling, enter designated Power trough through its grommet.
Page 22
BRIDGES II INSTALLATION GUIDE Power Distribution Storage Power Box In order to secure Storage power box to Storage cabinets it is necessary to reposition one of the storage supporting legs so that it will support the Storage power box as well.
Page 23
ACCESSORIES - DIVIDERS BRIDGES II INSTALLATION GUIDE Fabric Table Dividers Install mounting brackets into the bottom of Fabric Table Divider. 36”, 42” and 48” wide dividers require 2 brackets, 54” and 60” wide dividers require 3. 1) Slide bracket rods into the holes in the bottom of fabric dividers.
Page 24
ACCESSORIES - DIVIDERS BRIDGES II INSTALLATION GUIDE Fabric Table Dividers - Table Hung This divider secures to the rear edge of a table and serves as a privacy/modesty FABRIC panel. Pre-assemble the divider and mounting brackets: This divi privacy/ 1) Lay the divider on a clear surface.
Page 25
BRIDGES II INSTALLATION GUIDE Parallel Dividers, Back-to-Back Tables, Glass And Laminate 36”, 42”, 48”, 54”, 60” and 72” wide dividers have two back-to-back divider brackets. 78” and 84” dividers have three. STEP 1: Back-to-back divider brackets can be set up to support glass dividers and laminate dividers as well.
BRIDGES II INSTALLATION GUIDE Contract GLOBAL • January 2017 GLOBAL Contract • January 2017 INSTALLATION GUIDELINES INSTALLATION GUIDELINES Side-to-Side Laminate Divider Side 2 Side Laminate Divider Side 2 Side Laminate Divider Note: Side-2-side laminate divider can be installed in the middle of a worksurface and over...
Page 27
Contract GLOBAL • January 2017 GLOBAL Contract BRIDGES II INSTALLATION GUIDE • January 2017 INSTALLATION GUIDELINES INSTALLATION GUIDELINES Table Mounted Divider With Integrated Modesty Panel, Laminate Table Mounted Divider With Integrated Modesty Panel, Laminate Table Mounted Divider With Integrated Modesty Panel, Laminate...
Page 28
BRIDGES II INSTALLATION GUIDE Perpendicular, End of Run Note: the Perpendicular end-of-a-run divider can only be installed on rectangular legs. Remove vertical cable manager cover from both legs. STEP 1: Align top brackets with pilot holes and secure with supplied screws.! STEP 2: Slide the end-of-a-run divider top brackets between top of leg’s horizontal beam and...
Page 29
BRIDGES II INSTALLATION GUIDE Modesty Panel Recessed modesty panel flip down bracket kit consists of two pairs of brackets. STEP 1: Position the small brackets on the modesty panel so that the bracket’s wall with single hole A faces outer edge of the modesty.
Page 30
BRIDGES II INSTALLATION GUIDE Half Height Rectangular Leg Gable Note: Rectangular leg gables can only be installed on rectangular legs. Proceed by STEP 4: Wiggle the gable slightly up while making sure that both bottom brackets are removing vertical cable manager cover from both legs first.
Page 31
BRIDGES II INSTALLATION GUIDE Full Height Rectangular Leg Gable Note: Rectangular leg gables can only be installed on rectangular legs. Proceed by STEP 4: Wiggle the gable slightly up while making sure that both bottom brackets are removing vertical cable manager cover from both legs first.
Page 32
BRIDGES II INSTALLATION GUIDE Table Mounted Divider with Integrated Modesty Panel, Glass Secure Bracket to the glass. STEP 1: Slide Rubber washer onto threaded studs. STEP 2: Slide Spacers on the threaded studs with flange first. STEP 3: Position bracket onto the glass and secure with two anodized caps.
Page 33
BRIDGES II INSTALLATION GUIDE Glass Perpendicular, End of Run Divider Contract GLOBAL • January 2017 STEP 1: Slide Rubber washer onto threaded studs. INSTALLATION GUIDELINES STEP 2: Slide Spacers on the threaded studs with flange first. Glass Perpendicular, End of Run Divider STEP 3: Position bracket onto the glass and secure with two anodized caps.
Page 34
BRIDGES II INSTALLATION GUIDE Perpendicular, Side-to-Side Glass Divider NOTE: Cannot be installed over two, side-by-side rectangular legs. Only One shared or recessed leg. STEP 1: Press the rear edge of the divider into the bracket. STEP 2: Slide the divider with the bracket over the rear edge of the worksurface.
Page 35
BRIDGES II INSTALLATION GUIDE Elevated Shelves: Parallel / Perpendicular Parallel elevated shelf A fits over gap between two back-to-back tables. Grommets in its gables accommodate cable passage and Above worksurface power trough. Establish final location of Perpendicular elevated shelf B in accordance with your plans.
Page 36
BRIDGES II INSTALLATION GUIDE GLOBAL Contract • January 2017 INSTALLATION GUIDELINES Bridges Hanging Metal Shelf Installation Bridges Hanging Metal Shelf Installation STEP 1: Determine which side of the table the shelf should be on and make sure the front of the shelf is fl ush with the table leg.
Page 37
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Table Mounted Center Shelf Table Mounted Centre Shelf Note: Centre Mount Shelf MUST be installed before Under Work Surface Power Trough. STEP 1: Line up Bridges Storage leg holes with pilot holes on the worksurface.
Page 38
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES GLOBAL Contract • January 2017 Elevated Shelves: Parallel / Perpendicular Elevated Shelves: Parallel / Perpendicular INSTALLATION GUIDELINES Parallel elevated shelf A fi ts over gap between two Back 2 Back tables. Grommets in its gables accommodate cable passage and Above work surface power trough.
Page 39
BRIDGES II INSTALLATION GUIDE Table Mounted End Shelf Note: The table end shelf can only be installed on rectangular legs. Remove vertical cable manager cover from both legs. STEP 1: Secure hanging brackets to the table end shelf (24” and 30” table end shelves come with two, while 50.5”...
Page 40
BRIDGES II INSTALLATION GUIDE Table Mounted End Shelf STEP 5: Place worksurfaces so that they line up with the external edges of the table end shelf’s top. Secure worksurfaces and hanging brackets with supplied screws. STEP 6: Insert and rotate the gable bottom bracket into the leg, slide it up against the bottom gable edge.
Page 41
BRIDGES II INSTALLATION GUIDE Storage Tower To install storage towers in a worksurface-supporting configuration, please see support beam install. Cable basket - Please see wire basket install under storage spine. Storage Spine Storage units of equal depth can be configured to form longer, interconnected units supported by shared legs.
Page 42
BRIDGES II INSTALLATION GUIDE Storage Cabinet Leg Assembly STEP 1: Identify Screws: (A) 6 pcs. - 1/4 - 20 x 1” Pan Head Screws (B) 6 pcs - 5/16 - 18 x 1.75 Hex Socket Head Screws STEP 2: Secure Leg to the storage cabinet with the screws.
Page 43
INSTALLATION GUIDELINES Contract • January 2017 INSTALLATION GUIDELINES BRIDGES II INSTALLATION GUIDE GLOBAL Contract • January 2017 artitions INSTALLATION GUIDELINES on kit consists of two side gables and one rear partition. t Partitions Seat Partitions GLOBAL Contract • January 2017 ert provided pins into gable fi...
Page 44
GLOBAL Contract BRIDGES II INSTALLATION GUIDE • January 2017 INSTALLATION GUIDELINES Seat Privacy Partitions: Securing the seat to the partitions Seat Privacy Partitions: Securing the seat to the partitions STEP 3: Drive seat and partition levelers all the way in and bring the seat into position, all the way against the back partition.
Page 45
GLOBAL Contract GLOBAL Contract • January 2017 • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES INSTALLATION GUIDELINES Square Corner and Inline Block, no Outlet Square Corner and Inline Block, no Outlet Square Corner and Inline Block, no Outlet 25” high square corner block can function as a self-supporting, freestanding 25”...
Page 46
Contract GLOBAL • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Ganging Brackets Ganging Brackets Ganging bracket kit serves to connect seat to seat or seat to bridges storage in line. Place units into their fi nal position. STEP 1: Use Phillips or Robertson screw bit to loosen 4 machine screws (B) on the inner side of support legs.
Page 47
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Connecting Seat to Bridges Table Connecting Seat to Bridges Tables Some bridges collaborative seating units have been designed to connect to bridges tables supported by rectangular legs. These specialized units are selfsupporting, but connect to other components to form a rigid, integrated assembly.
Page 48
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Connecting Seat to Bridges Table Connecting Seat to Bridges Tables STEP 6: Install six fl at brackets as illustrated. STEP 7: Rest the 30” deep work surface on the fl at backrest.
Page 49
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Under Worksurface Power Trough and Bridges Seat/Table Application Under Work Surface Power Trough and Bridges Seat/Table Application Standard Under work surface Power trough brackets rely on shared table leg beams for support.
Page 50
GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES Connecting Display Wall to Bridges Tables Connecting Display Wall to Bridges Tables Display wall is typically supported by a Back 2 Back bridges table. See previous pages for detailed table installation instructions.
Contract • January 2017 GLOBAL Contract • January 2017 BRIDGES II INSTALLATION GUIDE INSTALLATION GUIDELINES INSTALLATION GUIDELINES Display Wall Cable Manager Display Wall Cable Manager - TV / Display Facing the Work Surfaces: Display Wall Cable Manager - TV / Display Facing the Work Surfaces:...
Page 52
Global US Headquarters/Distribution Center A $25 net handling charge per shipment 17 West Stow Road, P.O. Box 562 will be applied for non-UPSable orders of Marlton, New Jersey U.S.A. 08053 less than $2,000 list. T (856) 596-3390 T (800) 220-1900...
Need help?
Do you have a question about the Bridges II and is the answer not in the manual?
Questions and answers