Figure 6: Making Room For The Power Cord; Figure 7: Screwing On The Bracket - Mellanox Technologies MIS5025 Installation Manual

36 port infiniband qdr switch platform
Table of Contents

Advertisement

Rev 1.8
are using the second option insert the power cable before screwing the bracket to the vertical
support.
Option A
Option A puts the front of the switch ~5cm
behind the rack vertical support
Place to put
the power
cable.
Option A will require 3 flat head
This configuration also allows you to put the
power cord through the bracket.
16
Mellanox Technologies
If you need to bring the Power cord from the other side of the rack, recess the
switch and run the Power cord through the bracket, also using the slot in the
rail slide. Go to "Passing the Power Cord From the Connector Side to the
Power Side" on page 61 for detailed instructions on routing the power cord
from the power side to the connector side.

Figure 6: Making Room for the Power Cord

Figure 7: Screwing on the Bracket

screws
Power cord
Option B
Option B puts the front of the switch
even with the rack vertical support
Option B will require 4 flat head
screws

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mis5030Mis5035

Table of Contents