Connecting The "Single Speed" Filter Pump - Pentair E-Box MAESTRO Installation And Operation Manual

Table of Contents

Advertisement

41-42
"Input 3" information input on the 4X Extension Unit module
43-44
"Input 4" information input on the 4X Extension Unit module
45-46
Information input "Alarm 1" on the 4X Extension Unit module
47-48
Information input "Alarm 2" on the 4X Extension Unit module
49-50
Connection of the temperature sensor when solar heating is used
51-52
Power +/- output for the connection of a filling solenoid valve (24 V)
53-54
DATA +/- output for equipment connection Pentair with the DATA function
55-62
Connection of swimming pool projectors (12 V/50 W unit)
Prohibition
Never supply voltage (Neutral + Phase) to IN, AL inputs and AUX outputs
In order to operate the outputs correctly, it is necessary to configure them on the website.
These settings may be partly carried out on the interface of the MAESTRO, through the related
menus.
4.8.3

Connecting the "Single Speed" filter pump

The connection of the supply phase, the neutral and the earth must be made through the
connection terminal block according to terminals 7 and 8 (for the earth connection: proceed to the
connection on the dedicated terminal block).
Mandatory
Do not forget to adjust the thermal protection to the protection rating of the filtration
pump used.
Ref. SB-CU-IMP-062EBA / A - 11.05.2023
Installation and Operation Guide Version E-Box MAESTRO - Installation
Position of the thermal protection of
the single speed filtration pump, with
adjustment of the protection amperage
39 / 110

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-pf-ens-002e

Table of Contents