Pentair E-Box MAESTRO Installation And Operation Manual page 45

Table of Contents

Advertisement

Installing the water temperature sensor
Install the water temperature probe preferably before the pump filtration system.
1. Drill the PVC pipe (Ø50-70 mm) to make a hole with a diameter of 10 mm.
2. Remove the chips and check for the presence of the O-ring under the sensor.
3. Place the sensor in the hole then place the metal collar in the groove and tighten.
4. Connect the probe cable to the Probe Unit (see diagram Connections [
Installing the Air Temperature Sensor (Optional)
If the air temperature sensor is connected, it automatically becomes the reference value for frost-
free management. The air temperature probe is placed outside and protected from the sun's rays
so as not to distort the measurement. It spreads easily thanks to its 6 m long cable.
Info
If an air temperature probe is connected, then the air temperature information from the
radio relay will no longer be retained.
1
1
Fastening to a wall by screwing
2
Rilsan collar attachment to a horizontal bar of a grid
Ref. SB-CU-IMP-062EBA / A - 11.05.2023
Ø10 mm
1
2
Installation and Operation Guide Version E-Box MAESTRO - Installation
2
Page 46]).
3
Connection to
the Probe Unit box
45 / 110

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-pf-ens-002e

Table of Contents