Pentair E-Box MAESTRO Installation And Operation Manual page 52

Table of Contents

Advertisement

Installation and Operation Guide Version E-Box MAESTRO - Installation
Terminal blocks 25-26 (by dry contact)
Phase (L)
Earth
Neutral (N)
Connecting an additional pump or apparatus >12A at 230V
1. Connect it according to the diagram below on the output AUX 3 terminal blocks 13-14.
2. In the menu "Pool Properties > Menu Installation 4X Extension", see Menu installation 4X
Extension [
Page 48], select the output "filtration" if you wish to activate it during pool
filtration and customise the name if necessary.
Connecting a Pneumatic Push/Pull Valve for Filter Washing
1. Connect the valve according to the diagram below.
2. In the menu "Pool Properties > Menu Installation 4X Extension", see Menu installation 4X
Extension [
Page 48], select the output AUX  4 "Filter Wash" and customise the name if
necessary.
52 / 110
Earth
Terminal blocks 25-26 (by dry
contact)
Terminal blocks 15-16 (by 230V power
supply)
Terminal blocks 15-16 (by 230V power
supply)
Earth
Ref. SB-CU-IMP-062EBA / A - 11.05.2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb-pf-ens-002e

Table of Contents