IKONIX Associated Research HYAMP III Operation And Service Manual page 55

Ground bond tester
Hide thumbs Also See for Associated Research HYAMP III:
Table of Contents

Advertisement

Ground Bond Verification
From the Verification screen, press the TEST button to begin the verification
process.
At the end of the Verification process, a message will appear indicating the
outcome of the process. If the instrument passes the Verification (test failure,
indicating the fail detectors are working properly) the RESET button will
illuminate, the alarm will sound and the following message will appear:
If the instrument fails the Verification (test pass, indicating the fail detectors are
not working properly) the following message will appear:
51

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Associated Research HYAMP III and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

3130

Table of Contents