IKONIX Associated Research HYAMP III Operation And Service Manual page 46

Ground bond tester
Hide thumbs Also See for Associated Research HYAMP III:
Table of Contents

Advertisement

Hipot Start parameter
The Hipot Start parameter, found in the System Menu screen, controls whether the
Hipot test will run sequentially after the Ground Bond test or simultaneously with the
Ground Bond test. Please refer to section 4.1 Setup System for instructions on how
to set this parameter.
The Hipot Start parameter is only used when connecting the HYAMP III with an
Associated Research Hypot III. The parameter determines if the Hypot will run after
the HYAMP III has completed its test, GW. If the Hypot will run at the same time as
the HYAMP III, G + W.
The Hipot Start parameter directly controls the Start output relay. Setting the Hipot
start parameter to GW will momentarily close the start output relay at the end of the
Ground Bond test. Setting the Hipot start parameter to G + W will momentarily close
the start output relay at the start of the Ground Bond test.
42

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Associated Research HYAMP III and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

3130

Table of Contents