System Setup - IKONIX Associated Research HYAMP III Operation And Service Manual

Ground bond tester
Hide thumbs Also See for Associated Research HYAMP III:
Table of Contents

Advertisement

Test
Pressing the "Test" soft key from this menu will allow you to access the Parameter
Review screen. For specific instructions for reviewing and editing test parameters,
refer to section 4.3. Test Parameters.
System
Pressing the "System" soft key from this menu will allow you to access the Setup
System screen. For specific instructions for editing system parameters, refer to
section 4.2. System Setup.

4.2. System Setup

1. From the Perform Tests screen, press the "Menu" soft key. The Main Menu screen
will now be displayed.
2. From the Main Menu screen, press the "Menu" soft key. Results, Test and System
selections will now be displayed.
3. From this screen, press the "System" soft key. The Setup System Menu will now
be displayed.
From the Setup System screen, fourteen different hardware and software controls
may be accessed: PLC Remote, Single Step, Alarm, Contrast, Results, Lock, Mem
Lock, Hipot Start, Cal-Alert, Cal Date, Cal Due, Alert, Date, and Time. Pressing the
"Exit" soft key at any time will save all parameters and return to the Perform Tests
screen.
22

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Associated Research HYAMP III and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

3130

Table of Contents