Test Run Checklist - YASKAWA CIMR-DC4A0040AAA Technical Manual

Power regenerative converter
Hide thumbs Also See for CIMR-DC4A0040AAA:
Table of Contents

Advertisement

4.7

Test Run Checklist

Review the checklist before performing a test run. Check each item that applies.
No.
1
Thoroughly read the manual before performing a test run.
2
Check the
3
Set the correct power supply voltage.
4
Turn on the power supply to the converter and drive.
5
Correctly sequence the Run commands.
6
The
To give Run command and DC bus voltage reference from the digital operator, press
7
to LOCAL.
To give Run command and DC bus voltage reference from the control circuit terminals, press the
8
to set REMOTE. (The LO/RE indicator is lit off while REMOTE is set.)
YASKAWA ELECTRIC SIEP C710656 06F YASKAWA Power Regenerative Converter - D1000 Technical Manual
.
Wiring Checklist on page 76
should light after giving a Run command.
Checklist
4.7 Test Run Checklist
Page
76
86
86
89
LO
key to set
79,
85
RE
LO
85
RE
4
93

Advertisement

Table of Contents
loading

Table of Contents