The preparatory operations for commissioning of the unit are the responsibility of the customer:
-
Preparation of the premises and correctly functioning systems, in accordance with the relevant
requirements and regulations;
-
Positioning of the device in the installation area.
The device's characteristics and positioning and installation instructions are provided below.
[The customer is also provided with the specific document – "Installation Requirements for BPW1260".]
15.1

TECHNICAL CHARACTERISTICS

15.1.1 Water connections

"CW" COLD WATER
Connection required:
Flow-rate required [min – max]:
Pressure [min – max]:
Temperature [min – max]:
Max hardness:
Iron Fe2+ / Fe3+ [max]
pH
Minimum microbiological quality required:
"HW" HOT WATER
Connection:
Flow-rate required [min – max]:
Pressure [min – max]:
Temperature [min – max]:
Max hardness:
Iron Fe2+ / Fe3+ [max]
pH:
"D" DRAIN CONNECTION
Drain hose connection:
Temperature max:
Max height of drain above floor
User Manual
3/4"
10 – 18 l/min
100 – 600 kPa (1 – 6 bar)
5 – 25 °C (46 °F – 77 °F)
42
[To reduce wear of the steam condenser, hardness below 15°f is
recommended.]
0.5 ppm
7 – 8
"Potable water" (ref. data limits in European Directive 98/83/EC –
Italian Legislative Decree 31/2001)
3/4"
10 – 18 l/min
100 – 600 kPa (1 – 6 bar)
45 °C – 60 °C (113 °F – 140 °F)
42 °f
0.5 ppm
7 – 8
Rigid fitting DN100 (Ø110 mm)
60 °C
400 mm
193909105 rev.02