When planning the installation, consider the system weight for floor loading. The
strength of the installation surface must be adequate for point and distributed
loadings. The approximate weights are shown in Table 1.
Table 1. Weights
Number of UPSs
1
2
3
4
5
6
The system is bolted to a wooden pallet supported by wood skids. To unwrap the
system:
1.
If not already moved, use a forklift or pallet jack to move the system to the
installation area, or as close as possible. Insert the forklift jacks between the
skids at the front of the pallet.
The forklift jacks must be inserted between the skids at the front of the pallet (see Figure 3). If unloading
instructions are not closely followed, the system may cause serious injury.
NOTE Verify that the forklift or pallet jack is rated to handle the weight of the system (see Table 1 for
system weight).
Pallet Front
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Shipping Weight
(Pallet, Rack, Wireway,
BladeUPS Bar, and UPSs)
471.7 kg (1040 lb)
617.8 kg (1362 lb)
763.9 kg (1684 lb)
909.9 kg (2006 lb)
1060.5 kg (2328 lb)
1202.0 kg (2650 lb)
W A R N I N G
Figure 3. Inserting the Forklift Jacks
System Weight
(Excludes Pallet)
304.8 kg (672 lb)
450.9 kg (994 lb)
596.9 kg (1316 lb)
743.0 kg (1638 lb)
889.0 kg (1960 lb)
1035.1 kg (2282 lb)
Pallet Rear