UPS Setup
12. Attach the rear hold-down brackets to the rail and slide the brackets into the slots
on the EBM rear panel (see Figure 42).
13. Verify that the brackets are seated firmly, then tighten the wing nuts on the rear
hold-down brackets. The EBM is now secured in the rack.
14. Continue to the following section, "UPS Setup."
The UPS comes with all hardware required for installation in a standard EIA or JIS
seismic rack-mount configuration with square and round mounting holes. The rail
assemblies adjust to mount in 48-cm (19-inch) racks with front to rear rail distances
from 61 to 76 cm (24 to 30 inches) deep.
Checking the UPS Accessories
Verify that the following items are included with the UPS:
S
UPS front cover
S
Communication terminal block connectors:
- (3) two-pin connectors
- (2) two-pin connectors with jumpers
- (1) three-pin connector
S
(2) wire saddles
S
Communication cable (DB-9/DB-9)
Eaton BladeUPS (12 kVA) User's Guide
STANDARD SYSTEM INSTALLATION
Figure 42. Securing the Back of the EBM
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Rear Hold-Down
Bracket
57